A battery does not create electricity. It moves energy from one time to another, or holds it in reserve. A system asked to perform several duties at once compromises each of them, so the primary duty is established first: it determines the size, the control strategy and the physical arrangement. Where no duty emerges from the load data, storage is not recommended.
Three duties, three designs
The board below separates the duties that most often justify storage. One may dominate with a secondary benefit, but the primary duty is stated before equipment is discussed.
Time shifting
Energy produced or bought in one period is stored for use in a later period. The duty depends on a real difference between the two states, not on an assumption that later hours are expensive.
- Needs interval generation and demand profiles, plus the tariff periods that define surplus and need.
- Charge and discharge records should show energy moving in the intended direction on an ordinary day.
- Gives up round-trip losses and accepts a cycling pattern that accumulates over the life of the system.
Peak shaving
Short, high demand events are reduced by discharging at the moment they occur. A peak that is real but not charged for is a different proposition from one that drives a demand charge.
- Needs demand data at short resolution, the charge structure and knowledge of what causes the peak.
- Success is read by comparing measured maximum demand with the equivalent period before commissioning.
- Gives up the reserve that could otherwise serve other duties while it is held for the next event.
Backup supply
Energy is held for an interruption to the incoming supply. This is a continuity function with a defined load list and a changeover arrangement, not a general aspiration for resilience.
- Needs a stated continuity requirement, the nominated loads and the changeover point at the switchboard.
- Changeover tests and reserve records confirm the system is ready when it is required.
- Gives up everyday use: capacity kept in reserve cannot also be cycled for shifting or peaks.
| Duty | Question it answers | Data that decides it | How success is read afterwards |
|---|---|---|---|
| Time shifting | Can energy be moved from a period of surplus to a period of need? | Interval generation and demand profiles, plus the tariff periods that define the two states. | Charge and discharge records show energy moving in the intended direction on an ordinary day. |
| Peak shaving | Is there a repeatable peak that the tariff actually charges for? | Interval demand at short resolution, the demand charge structure and the events that cause the peak. | Measured maximum demand is compared with the same period before the system was commissioned. |
| Backup supply | Which loads must keep running, and for how long? | A defined continuity requirement, the load list and the changeover arrangement at the switchboard. | Changeover tests and reserve state records confirm the battery is ready when required. |
The measurement that will show whether the duty was performed is agreed at the same time as the control strategy, so the result can be read after commissioning.
A system kept fully charged for backup cannot also spend its capacity shifting energy every day; a battery cycled hard for peak reduction will not sit idle waiting for an outage. Control software can prioritise one duty over another but cannot remove that conflict. The primary duty is named, secondary effects are described as incidental, and the system is sized accordingly. The scope states what the battery does on an ordinary working day as well as during an interruption.
The inputs that matter
Monthly invoices establish a total; they do not reveal the short events that determine whether a battery has a duty. Interval demand at the meter, at half-hourly or finer resolution, is requested together with the tariff schedule that applies to those intervals. Without both, a peak cannot be valued and a shifting duty cannot be timed. Where solar already exists on the site, generation intervals are requested as well, so the overlap between generation and demand is measured rather than estimated.
Short-resolution demand reveals the peak and the hour it occurs. Monthly totals hide both, and a battery cannot be sized against a total.
A charge that responds to demand gives peak shaving a purpose. The actual schedule is read rather than assuming any battery will improve a bill.
Solar is a suitable source when generation and demand overlap. Where they do not, the battery moves energy bought from the network.
A current single-line diagram, switchboard condition and available space, the network connection agreement, the location of any critical loads and the site's operating hours shape what can be installed and how it may be controlled. Expected behaviour during a loss of supply is asked about explicitly and recorded. Items that are unavailable are named as gaps, with the conclusions those gaps restrict. Depth of discharge and cycling frequency are treated the same way: a design using only part of the capacity may last longer than one that regularly empties it, and that trade-off is stated in the scope.
A design sequence for storage
This sequence is specific to storage. It is the reasoning used to decide whether a battery is justified and what it should do, distinct from the delivery process on How We Work. Each step ends with a finding that can be recorded.
01 · Name the duty
The question is stated as shifting energy, reducing a peak or maintaining supply. If a client cannot say which outcome matters most, that is itself a finding to resolve before any sizing begins.
02 · Read the data and the tariff
Interval demand is examined alongside the tariff structure. A peak that is real but not charged for is a different proposition from one that drives a demand charge, and only the second gives storage a clear purpose.
03 · Test the charging source
Checks are made on whether solar generation, off-peak supply or another source can charge the battery in a way that supports the duty. The source determines when energy is available, not just what it costs.
04 · Check the site
Space, ventilation, fire separation, access and the condition of the electrical infrastructure are reviewed. A suitable duty cannot rescue a system that cannot be sited safely.
05 · Define the control strategy
Operating rules are written down: when the battery charges, when it discharges, what takes priority and what happens when the incoming supply fails. The strategy is the design, expressed as behaviour.
06 · Commission and monitor
The installed system is tested against the intended behaviour, metering is configured so performance can be read, and records are handed over. Monitoring is how the assumed duty is checked against the one actually performed.
Control strategy by duty
A battery's behaviour is set by rules, and those rules follow the primary duty. The matrix shows the general shape of each strategy. Final settings belong in the site-specific scope, because they depend on tariff periods, connection terms and the client's own operating priorities.
| Primary duty | Charging rule | Discharging rule | Priority when duties conflict |
|---|---|---|---|
| Time shifting | Charge when surplus generation or a lower-cost period is available. | Discharge into site demand during the defined later period. | Cycling for the shift takes precedence; reserve is not held back for an unnamed continuity duty. |
| Peak shaving | Rebuild reserve outside the windows in which peaks are expected. | Discharge when demand approaches the agreed threshold. | Peak events take precedence over routine shifting, so capacity is preserved for the moments that matter. |
| Backup supply | Maintain the reserved state of charge and avoid routine deep cycling. | Support nominated loads only when the incoming supply is lost. | Reserve is protected above all everyday uses; the battery deliberately does less on an ordinary day. |
Siting, safety and responsibility
Storage equipment needs space around it. Ventilation, fire separation and safe access are considered alongside the site's own constraints: where equipment can be placed, how it is reached and which nearby operations must not be disturbed. These requirements are identified during review rather than at delivery. Relevant electrical safety and installation requirements, network connection conditions and manufacturer instructions are established at that point. Licensed specialists carry out licensed electrical work and deliver compliance with those requirements; the scope names that responsibility, and the documentation is provided at commissioning.
Commissioning confirms that the system behaves as the control strategy intends. Metering is arranged so charge, discharge and state of operation can be read after handover. If the peaks the design was built around stop occurring, the records show it and the arrangement can be revisited. Handover material gathers commissioning records, settings, test results and operating notes in one place, with any outstanding item listed with its status.
Charge and discharge records are compared with the intended duty stated in the scope.
Licensed electrical work remains with licensed parties, named in the scope and documented at commissioning.
When the peak, the tariff or the continuity requirement changes, the earlier assessment is reopened.
If interval data shows no duty, if demand charges are absent, if the connection or site cannot accommodate the equipment safely, or if the same capital would reduce demand first, storage is not recommended. The assessment records what would have to change for it to be reconsidered.
When the recommendation is no battery
Any one of the conditions below can end the storage proposal while leaving other measures open.
- No duty appears in the data. The load is steady, there is no charged peak, and there is no continuity requirement worth reserving capacity for. A battery would sit idle and perform no useful work.
- The demand charge is absent or immaterial. Without a charge that responds to the peak, reducing a peak has no value to the site.
- Demand reduction comes first. If the same capital would remove the peak by changing an operating practice or an inefficient load, that measure is recommended ahead of storage and reviewed before a battery is reconsidered.
- The site cannot accommodate the equipment. Space, ventilation, fire separation, access or the state of the electrical infrastructure may make a safe installation impractical.
- The connection prevents the intended behaviour. If the charging source cannot be used as assumed, or export conditions defeat the strategy, the duty cannot be performed as designed.
When storage is declined, the assessment records what would have to change for a battery to become sensible: a new tariff, a changed operating pattern, a stated continuity requirement or a resolved siting constraint. The site, the tariff and the continuity requirement can all change, and the file allows the question to be reopened against the original evidence.
Technical questions about battery storage
What are the three duties a battery can perform?
Time shifting moves energy from a period of surplus to a period of need, and requires interval generation and demand profiles plus the tariff periods that define the two states. Peak shaving discharges during short, high demand events, and requires demand data at short resolution together with a charge structure that actually responds to the peak. Backup supply holds energy for an interruption to the incoming supply, and requires a nominated load list, a stated duration and a changeover arrangement at the switchboard. Each duty implies a different size and control strategy, so the primary duty is named before sizing.
When is storage not justified?
When the load is steady with no charged peak and no continuity requirement; when the demand charge is absent or immaterial; when the same capital would remove the peak through an operating change or an inefficient load; when space, ventilation, fire separation, access or the electrical infrastructure prevent a safe installation; or when connection conditions prevent the intended charging and discharging behaviour. In those cases the assessment states the finding and records the conditions under which storage should be reconsidered.
How are siting and safety requirements handled?
Ventilation, fire separation, safe access clearances and the route for reaching and isolating the equipment are established during review, alongside the site's own constraints on where plant can sit and which operations must not be disturbed. Applicable electrical safety and installation requirements, network connection conditions and manufacturer instructions are identified at that stage. Licensed specialists carry out the licensed work and deliver compliance with those requirements; the scope names that responsibility and the documentation is provided at commissioning.
How is the control strategy set?
Operating rules are written down before installation: when the battery charges, when it discharges, what takes priority when duties conflict, and what happens when the incoming supply fails. A time-shifting system cycles for the shift; a peak-shaving system rebuilds reserve outside expected peak windows and discharges at an agreed demand threshold; a backup system maintains its reserved state of charge and avoids routine deep cycling. Final settings depend on tariff periods, connection terms and the client's operating priorities, and are recorded as installed in the handover file.
How does degradation affect the design?
Cycling accumulates over the life of the system, so depth of discharge and cycling frequency are design inputs rather than product details. A design that uses only part of the available capacity may last longer than one that regularly empties it, and that trade-off is stated in the scope alongside the duty it serves. Round-trip losses are accounted for in a time-shifting case. A backup system held in reserve cycles less but performs no everyday work. Charge, discharge and state-of-operation records allow actual behaviour to be compared with the assumption used at sizing.
Should storage be paired with solar?
Only where the interval data supports it. Generation intervals and demand intervals are examined together to establish whether surplus generation exists at hours the site cannot use it, and whether the tariff makes moving that energy worthwhile. Where generation and demand already overlap closely, there may be little surplus to shift and no duty for a battery. Where they do not overlap, the battery may simply move energy bought from the network, which is a different case with different inputs. Storage is scoped after the array's sizing is settled, not added to it by default.
How is a battery sized when several duties compete?
Duties are ranked first: peak reduction, solar shifting, backup, export constraint. The highest-priority duty sets the power and the second sets the duration where it fits. A reserve for backup cannot also be cycled daily, and the scope states which duty was given priority.
Where can a battery be housed?
Outside the occupied envelope, with the clearances and thermal conditions the equipment requires, close to the switchboard it serves and clear of flood or vehicle risk. The location is agreed before selection because it constrains size, cooling and access.
How is degradation treated in the case?
Through warranted throughput and capacity retention rather than a single efficiency figure. Round-trip losses, auxiliary load and expected cycling are applied to the tariff periods the battery serves, and augmentation is planned where the duty outlives the warranty.
Duty
Duty before capacity.
A battery is specified by the work it does each day, not by the number on the cabinet.
Peak reduction, solar shifting, backup and export constraint each imply a different power rating, duration and dispatch rule. Some combinations are incompatible: a reserve held for an interruption cannot also cycle a full capacity daily, and a battery sized for a short sharp peak carries more power per unit of energy than one sized to move afternoon generation into the evening.
The duty also sets how the asset is measured. A peak-shaving battery is judged on the intervals it trims at the meter; a shifting battery is judged on energy moved between tariff periods. Both are checked against the same records that sized the asset, which is why interval data at half-hourly or finer resolution is requested before a size is proposed.
Location constrains the design as much as the duty does. Clearances, thermal conditions, flood and vehicle risk, cable distance to the switchboard and the space available outside the occupied envelope are settled before equipment is selected, because they determine cooling, enclosure and access.
Storage work
Peak shaving and paired storage.
A cold store battery specified around compressor events, and storage paired with a constrained array.
Client comment
On ranking duties.
A comment on what happened once the duties were put in order.
“We had assumed one battery would do three jobs. Ranking the duties showed that only one of them was worth paying for.
Discuss a site