Home / Solutions / Commercial Power Solutions

Solution 05 — Integrated power

Commercial Power Solutions

Generation, storage and controllable load arranged as one electrical arrangement. We design the physical side of a site's power, not an electricity retail product.

Scope boundary

Where this scope begins and ends

Inside the boundary

The electrical arrangement on site

Commercial power solutions bring together the equipment installed at a site and the way that equipment is electrically coordinated. The work begins at the electrical boundary of the premises and deals with what happens inside it: how generation feeds load, where storage sits, which circuits can be shed and how the export ceiling is respected.

  • Array output matched to load and the export limit.
  • Storage charged and discharged against a stated duty.
  • Non-essential load shed before a demand peak is recorded.
  • Protection coordination between new devices and the existing board.
Outside the boundary

What stays with other parties

No electricity is sold, no account is held on a client's behalf, and no retailer is replaced. The boundary is set out in writing at the outset.

  • The retail account stays with its current holder, who remains responsible for supply, metering and settlement.
  • The network connection agreement is a separate instrument, varied through the network operator rather than through this office.
  • Bill adjustments arising from on-site generation depend on meter data and retail terms, not on the equipment.
  • Metering changes are described as complete only once the relevant party has completed them.

The practical line is drawn at the meter and the switchboard. Anything upstream — the retailer relationship, the meter configuration, the network agreement and settlement — remains with the existing account holder and the network operator. Anything downstream is the subject of this scope. There is no agency arrangement with a retailer, no signing of a client's connection agreement, and no promise about what will appear on a bill.

One arrangement, several instruments

An array, a battery, controllable loads and the connection agreement must describe the same reality. When they do not, the result is curtailment, nuisance tripping or an export limit that nobody mapped when the equipment was specified. Handover documentation names the ceiling, the curtailment method, the measurements available and the action required if an alarm appears.

Coordination map

What has to agree with what

The decisions below must be consistent before equipment is ordered. Each row comes from a problem that appears repeatedly when these elements are designed in isolation.

ElementDepends onWhat must be settledCommon failure
Solar arrayRoof or ground area, structure, inverter capacitySize relative to load and export limitArray sized to roof area rather than network capacity
Battery storageLoad profile, tariff, switchboard spacePower rating, duration and duty cycleBattery bought for energy capacity when the peak needed power
Controllable loadsPlant schedule, comfort or process toleranceWhich loads may be shed and for how longControl strategy that conflicts with operating requirements
Connection agreementNetwork operator, metering, export limitExport ceiling and any dynamic operating envelopeEquipment commissioned before the agreement is varied
Retail accountRetailer, meter configurationWho holds the account and who approves changesAssumption that on-site generation changes retailer
Backup supplyCritical circuits, generator, transfer arrangementWhich circuits are protected and how switching occursStorage assumed to provide backup without a transfer path

An export limit is a boundary the site must respect at all times. Where the limit is tight, generation may be reduced at the inverter, surplus may be absorbed by storage, or a controllable load may be brought forward to consume it. Design proceeds against the limit that applies, not the one that would be preferred, and the behaviour is made visible so that reduced output on a clear day is understood rather than treated as a fault.

Site conditions and the arrangements they suggest

The table below maps observed conditions to the arrangement that usually follows. Two sites with the same condition can still warrant different answers once cost, access and timing are examined. The last column names the fact that would change the answer.

Site conditionFirst considerationArrangement often appropriateWhat would change the answer
Steady daytime load, low evening demandGeneration matched to operating hoursSolar generation with minimal storageA tight export limit or a tariff that rewards evening supply
High demand charge from short peaksWhich plant creates the peak and whenStorage with a power rating sized to the peak, possibly load controlPeaks that fall outside the site's controllable hours
Constrained export allowanceWhether surplus can be absorbed on siteGeneration sized to the limit, with curtailment or controllable loadA variation to the connection agreement that raises the ceiling
Significant evening or overnight loadDuty cycle and duration requiredStorage charged from daytime generation or off-peak supplySwitchboard space, separation requirements and access
Critical circuits requiring continuityWhether a transfer path existsBackup arrangement with protected circuits and a defined switching sequenceConsent to interrupt other circuits during transfer
Leased premises with several occupantsWho owns the switchboard and who holds the accountScope limited to the demised area with clear consent boundariesLandlord works or a shared connection that one occupant cannot vary
Plant with flexible schedulesProcess tolerance for interruptionControllable load agreed with the operator before designA production requirement that overrides shedding on most days
FIG 01Spare ways, busbar rating and protection settings at the switchboard set the ceiling on what can be connected.

The instruments in play

Terms that decide the design

Each term below names a separate object with its own owner and its own timetable.

Retail account

The commercial relationship for supply, metering and settlement. It remains with the party currently holding it, and on-site equipment does not transfer it to another retailer.

Connection agreement

The instrument between the site and the network operator setting the export ceiling and any operating envelope. Changes are negotiated with the network operator, and they carry their own programme.

Export limit

A hard boundary at the connection point. Generation may be curtailed, surplus absorbed by storage or taken by a controllable load, but the limit is not treated as advisory.

Switchboard

The physical assembly where generation, storage, load and protection meet. Its spare ways, capacity and protection settings set the ceiling on what can be connected safely.

Duty cycle

The work a battery is actually asked to do: peak reduction, evening supply, backup support or absorption of surplus. Duty determines power rating and duration, not the other way round.

Transfer arrangement

The switching path that lets storage support protected circuits during an outage. Without it, a battery specified for peak reduction provides no backup function.

Large sites rarely take all of this at once. Electrical work is staged so that capacity arrives when it is needed and each stage can be commissioned without rewiring the next. The actual order follows the site's constraints and the client's capital gates.

Site inputs and the decisions they fix

Twelve months of load data
Confirms the peak pattern and the hours generation can serve.
Meter arrangement
Settles who reads the meter and what can be measured.
Export ceiling
Sets the maximum array output before curtailment or absorption.
Switchboard capacity
Limits the inverter and storage connection points.
Protection settings
Determines whether new devices can operate without nuisance tripping.
Critical circuits
Defines whether a transfer arrangement is required at all.
Plant tolerance
Decides which loads may be shed and for how long.
Connection variation
Sets the programme where the existing ceiling is too low.

Operating reality

Staged provision and visible curtailment

Three responses to surplus are usually available, and many sites use a combination. Generation can be reduced at the inverter; surplus can be absorbed by storage; or a controllable load can be brought forward. The order is a design decision driven by the agreement, the load profile and the condition of the equipment. A battery is not justified before its duty has been established. A site able to move a process load into the solar window may need less hardware than one that exports everything. Where several suppliers provide the pieces, the interfaces between them are drawn explicitly rather than left to be discovered during commissioning.

Staged provision follows the same reasoning. The first stage establishes the baseline and the boundary conditions; later stages add only what the baseline supports. Each stage is commissioned against the export limit applying at that time, so an early array is not left exporting into an arrangement designed for a later one. Where a connection variation is pending, installation is sequenced so that equipment can be energised safely within the current limit and reconfigured once the variation is granted.

Documented behaviour

The handover record states the export ceiling, the curtailment method, the measurements available and the action required if an alarm appears. An operator new to the site should be able to read what the system does from that record. Reduced output on a clear day should be explainable from the site's data within minutes.

The commissioning sequence

Commissioning tests the arrangement rather than the individual items. A battery that performs correctly in isolation can still conflict with protection settings on an older board, and an array that meets its output rating can still breach an export envelope under a particular combination of load and irradiance.

What is verified at handover

Export envelope
Confirmed under real operating conditions, not inferred from nameplate figures.
Curtailment
Trigger, response time and recorded measurement checked against the design.
Protection
Coordination between new devices and the existing board verified on site.
Transfer path
Protected circuits exercised if backup is part of the stated duty.
Control interface
Shedding behaviour tested against the tolerances agreed with the operator.
Operator record
Alarm responses and available measurements written into the handover document.

Common questions

Questions about power arrangements

Where is the boundary with the retail account?

At the meter and the switchboard. The retail account, meter configuration, network agreement and settlement stay with the current account holder and the network operator. This scope covers the equipment inside the premises and its coordination. Installing generation or storage does not change the retailer, and the questions to put to the retailer about billing are identified rather than answered on its behalf.

How are the array, battery and load coordinated?

They are designed as one arrangement against the same load profile and connection terms. Array size is set against daytime consumption and the export ceiling; the battery's power rating and duration follow its stated duty; controllable loads are agreed with the operator before design. Protection settings, control interfaces and metering are checked together so the elements do not conflict at commissioning.

What sets the export limit?

The connection agreement with the network operator, which states the export ceiling and any dynamic operating envelope at the connection point. The limit is a hard boundary, not advisory. Where the existing ceiling is too low for the proposed array, a variation is negotiated with the network operator on its own timetable, and equipment is sized and commissioned against the limit that actually applies.

What happens when generation exceeds the limit?

Surplus is handled by one or a combination of three responses: output reduced at the inverter, surplus absorbed by storage, or a controllable load brought forward to consume it. The method is recorded in the design, verified at commissioning and made visible in the site's measurements, so reduced output on a clear day is explained by the data rather than treated as a fault.

Can the arrangement be staged?

Yes. The first stage establishes the baseline, records spare switchboard capacity and commissions within the export limit applying at that time. Later stages add capacity without replacing the first, provided protection settings and control interfaces were designed with them in mind. Where a connection variation is pending, equipment is energised within the current limit and reconfigured once the variation is granted.

When to begin somewhere else

The right first scope

If a site's fundamental constraints are still unknown, project development is the better first scope. If consumption can be reduced substantially before any equipment is added, energy consulting should come first, because it changes the load that an integrated arrangement would serve. Starting with integrated power makes sense once the load is understood, the connection is viable and the client wants the elements designed as one system rather than purchased separately.

Albeta Energy works from its single office at 12/43 Heathcote Road, Moorebank NSW 2170. The company is not an electricity retailer and does not offer residential systems. Enquiries may be directed to 02 7201 8622 or info@albetaenergy.com.au.

Connection

Arrangements around the connection.

Generation and storage are additions to an electrical system that has to accept them.

A switchboard has a busbar rating, spare ways, a fault level and a thermal margin. Comparing the proposed addition with those figures decides whether the board can accept it, needs modification or requires replacement. Protection coordination and labelling follow, because an addition changes the fault current seen downstream.

The connection agreement sets the terms for import, export and protection. Where the proposal exceeds them, the network's answer sets the timetable, so the enquiry is made before equipment is ordered. Where several tenancies share a supply, metering boundaries and who benefits from the output are settled before the design.

These arrangements are often the real critical path of a project. A generation stage that depends on board works inherits their date, which is why the board is scoped as its own item with its own programme rather than folded into an equipment quotation.

Client comment

On separating board works.

A comment on why the switchboard was scoped on its own.

“

The switchboard work was scoped as its own project with its own date. That let the generation stage proceed on evidence rather than optimism.

Electrical supervisorWarehouse, western Sydney

Review a supply arrangement

Describe the electrical arrangement.

Board condition, connection terms and the proposed addition are the three inputs.

Switchboard condition, or the most recent inspection finding.

The proposed addition in approximate kW or kVA.

Any export limit or protection condition in the connection agreement.

The form prepares a message in your own email program, addressed to the Moorebank office. Nothing is sent until you send it. Details are used only to answer the enquiry, as described in the Privacy Policy.