Home / Solutions / All Solutions

Solutions

Choosing a starting point, not a catalogue

Five areas of work address different parts of the same problem. Selection and sequence decide which lever fits a site, and which should come first.

Most commercial sites could be approached in several ways. Generation, storage, efficiency, development work and power arrangements act on different parts of a site's electricity use. The useful question is which one should be applied first given what the site is doing and what the client needs to change. The selection follows interval demand, building condition and connection terms.

Evidence sets the lever

A roof does not justify an array, and the presence of solar does not justify a battery. Interval demand, building condition and connection terms decide what is worth doing. Where those inputs are incomplete, the first scope is an investigation rather than a purchase order.

Order changes the size

Reducing demand can change the size of plant that is needed. Resolving a roof programme can determine whether an array is possible at all. Sequence is part of the design.

One written scope

Whatever combination is chosen, one document holds the assumptions, exclusions, interfaces and decision points. An area may be recommended later, or not at all, if the data does not support it.

One point of contact

Every enquiry goes to the Moorebank office regardless of the entry point, and the same file follows the work through to handover.

The entries below include this overview and the five areas of work. Each links to a fuller description of the technical inputs and the conditions that can stop a project.

SelectionThe five areas are compared against the same interval data, so measures are not sized separately from one another.

How the five fit together

The areas are not a ladder in which one always leads to the next. A single building can qualify for several at once, and the interactions between them decide the outcome.

One site, several levers

A single building may support generation, a demand reduction and a connection change at the same time. Comparing them against the same interval data keeps the choices consistent with one another rather than negotiated separately.

Sequence changes the outcome

Reducing a load first can make a smaller array sufficient. Resolving a roof issue first can make an array possible at all. The order of work is part of the design, not an afterthought added once equipment is chosen.

One written scope

Whatever combination is selected, it is recorded in a single document with the assumptions, exclusions and decision points stated together. Interfaces between areas are named, so a change in one does not silently invalidate another.

Comparing the areas

This table describes what each area is for, when it applies and what it does not do.

AreaWhat it is forWhen it appliesWhat it does not do
Solar PVGenerate electricity on site during daylight hours.When the load, roof and connection support useful generation.It does not supply power at night, and it cannot override an export limit.
Battery storageMove energy in time, reduce a peak or hold a supply.When interval data shows a duty the battery would actually perform.It does not create energy and is not justified by the mere presence of solar.
Project developmentTurn an early question into a defined, decision-ready path.When constraints, staging or approvals need to be resolved first.It is not a substitute for a site review, and it does not promise an outcome.
Efficiency & consultingUnderstand and reduce demand before new plant is considered.When bills are high relative to output, or the pattern of use is unclear.It is not a retail supply service and does not sell electricity.
Commercial powerAlign on-site generation and load arrangements with operations.When the way a premises operates is the binding constraint.It does not replace licensed network work or assume responsibility for it.

Choosing a starting point

When the fit is unclear, the order below keeps equipment decisions behind the site evidence.

  1. Start with the bill and the load. If you cannot explain when the site uses electricity, an energy review or a detailed look at interval data comes before any equipment discussion. Generation and storage are both sized against demand, not against a roof or a catalogue.
  2. Check the physical setting. Roof age, shading, switchboard capacity and connection limits decide whether a proposed measure is possible. Where those facts are uncertain, project development work can structure the questions before capital is committed.
  3. Test the sequence. Ask whether reducing demand first would change what is needed. A smaller load can make a smaller system sufficient, and a resolved roof issue can make an array viable. The order is a decision in itself.
  4. Then select the lever. With load, fabric and connection understood, the appropriate area usually becomes clear — and sometimes the answer is to wait, or to do nothing yet.

Whichever starting point is chosen, the enquiry goes to the same office. Advice can be given on a single area or across several, with the boundaries between them visible in one written scope. If a review shows that a different area would serve the client better, that is stated.

Matching a solution to a site condition

Each row names a condition encountered in enquiries and the area of work that usually answers it. A site can meet several conditions at once, in which case the order in which they are addressed matters more than the list itself.

Site conditionRelevant areaWhy it fits
Daytime demand that follows daylight, with a sound roof and available connection capacitySolar PV SolutionsGeneration is produced when the site is using it, so self-consumption is high and the export question is manageable.
A repeatable evening peak, a demand charge set by short events, or a circuit that must stay suppliedBattery Energy StorageStorage has a defined duty supported by interval data. Without such a duty it has nothing useful to do.
Unresolved constraints, several decision gates, or a need to coordinate parties before capital is committedRenewable Energy Project DevelopmentDevelopment structures the questions and the decisions, so that a scope is ready before equipment is fixed.
Bills that are high relative to output, or a pattern of use nobody can explainEnergy Efficiency & ConsultingUnderstanding and reducing demand first changes what any later plant needs to deliver.
An operating pattern — shift work, critical loads or restricted access — that governs what can be installed and whenCommercial Power SolutionsThe arrangement is scoped around how the premises actually runs, not around a generic system size.

Which comes first

Two starting orders account for most projects. The choice between them depends on which facts are already reliable enough to design against.

Understand, then build

Review or development work first

Where the pattern of use is unclear or the physical constraints are unresolved, a consulting review or development work comes first. Demand is reduced or explained, the roof and switchboard are verified, and plant is then sized against a load that has been tested.

  • Applies where bills are high relative to output.
  • Applies where consent, staging or access are the binding issues.
  • Outcome: a smaller, better-targeted system, or a decision to defer.
  • The extra work is included only where it changes at least one decision.
Plant first

Direct sizing when the inputs are known

Where interval data, roof condition and connection capacity are already understood, generation can be scoped directly. Consulting work is reserved for the parts of the site that remain uncertain.

  • Applies where the load already follows daylight hours.
  • Applies where no approval or shutdown gate blocks the work.
  • Outcome: a shorter path from review to scope.
  • Remaining uncertainty is recorded in the scope with its consequences.

How the five combine in practice

A single site may use consulting work to establish a baseline, development work to resolve a consent or staging gate, generation to offset daytime demand, storage to address a defined evening or demand-charge duty, and a power arrangement to coordinate those measures with the way the premises operates. The combination is written into one scope with the interfaces stated.

Combinations are scoped in the order the site demands. Reducing demand before sizing generation avoids an oversized array; resolving a roof programme before fixing panels avoids removing them for a re-roof; establishing which circuits need support before specifying storage avoids a battery connected to the wrong loads. Where two areas would duplicate one another — for example storage installed to address a peak that efficiency work has already removed — the redundant element is dropped.

Three questions that settle the choice

Can I explain when the site uses electricity?

If not, begin with consulting work or a review of interval data. Generation and storage are sized against demand by time of day.

What is the binding constraint — load, fabric or approval?

A load problem points to consulting or storage; a roof or switchboard problem points to development; an operating pattern points to an integrated power arrangement.

Does each measure have a job after the others are done?

If a measure only makes sense alongside an assumption that another measure will change, the sequence is wrong. The combination is tested as a whole before any part is committed.

Scope boundary

Albeta Energy is not an electricity retailer and does not install residential systems. Electricity is not sold, no retail account is held, no bills are issued and a site's retailer is not changed. The account remains with its existing holder, and any interaction with a retailer or network operator happens through the proper channels with the account holder involved. On-site generation concerns equipment inside the premises and its coordination with the supply already there.

Company work is confined to commercial, industrial and logistics sites, where decisions turn on interval data, switchboard capacity, tenancy and operating patterns. Advice about household tariffs or domestic rebates is outside that scope. No client names or project values are published; examples on this website are described by problem, method and outcome alone.

Choosing between the five solutions

Which solution should a site start with?

The one that addresses the binding constraint. If the pattern of electricity use cannot be explained, Energy Efficiency & Energy Consulting comes first, because generation and storage are both sized against demand. If the roof, switchboard or approval position is unresolved, Renewable Energy Project Development structures those questions before capital is committed. If interval data, roof condition and connection capacity are already known, Solar PV Solutions can be scoped directly. Battery Energy Storage follows only where the data shows a duty, and Commercial Power Solutions applies where the operating pattern governs what can be installed and when.

Can more than one area be scoped together?

Yes. A site may combine a consulting baseline, development work on a consent or staging gate, generation for daytime demand, storage for a defined peak or continuity duty, and a power arrangement coordinating them with operations. The combination is recorded in one written scope with the interfaces named, so a change in one element does not invalidate another. Each measure must still have a job after the others are completed; where two would duplicate one another, the redundant element is dropped.

Does installing solar mean a battery should be added?

No. Storage requires a stated duty supported by interval data: shifting energy between periods, reducing a peak the tariff charges for, or holding supply for nominated loads during an interruption. Where the load is steady, no demand charge applies and no continuity requirement exists, a battery would perform no useful work. The assessment records what would have to change at the site for storage to become sensible later.

When is demand reduction recommended ahead of new plant?

When the same capital would remove the load or the peak that the plant was being sized to serve. Examples include an inefficient motor or refrigeration load, lighting operating outside occupied hours, or an operating practice that creates a short demand event. Reducing demand first can make a smaller array sufficient, or remove the peak that storage was intended to shave. The reduced load profile is then used for sizing, rather than the original one.

What if the review recommends doing nothing yet?

That is a recorded outcome. The client receives the review, the constraints identified and the conditions under which the question should be reopened — a roof renewal, a tariff change, a tenancy change or an expansion of the premises. No equipment is ordered against an assumption that has failed. The file is held at the Moorebank office, so a later enquiry is assessed against the earlier evidence instead of starting from scratch.

How do I know which of the five areas applies?

From the question rather than the product. Bills high relative to output point to efficiency or tariffs; a suitable roof and a daytime load point to generation; a peak that repeats points to storage; uncertainty about the site's future points to development.

Can several areas be scoped together?

Yes, and often they are sequenced. An array may follow a load reduction; storage may follow the array once its duty is clear. One written scope can cover the combination, with each element's assumptions stated.

Is consulting independent of equipment supply?

Yes. A review can be commissioned and acted on without proceeding to installation, and the office does not treat a recommendation as an order.

Does the company sell electricity?

No. It is not a retailer, does not issue bills and does not represent one. Tariffs are analysed because they change the value of a design.

Client comment

On treating the work as a sequence.

A comment on why the order of the five areas matters.

“

The five areas were presented as a sequence rather than a menu. That changed which question we asked first.

General managerDistribution centre, Western Sydney

Discuss a site

Send the site suburb, the type of premises and the question; the Moorebank office replies with the information needed to assess it.

This form prepares an email in your own mail application. Details are handled under our Privacy Policy.