Workshops, processing lines and manufacturing plants. Here the process dominates the electrical brief, and the building is often there to house equipment rather than people.

Process before panels

When the load is the machine

In an industrial facility the demand is set by what the plant is doing, not by the clock on the wall. A continuous process may draw a steady load for days at a time; a batch operation may cycle between a high running state and a near-idle state every few hours. Both differ from a commercial daytime profile, and both change what generation and storage can usefully do. The process pattern is established from interval data and from the operators who know the sequence, then the two accounts are tested against each other.

Start-up peaks deserve particular attention. A plant that runs smoothly at a modest steady load may draw several times that figure for a short period when motors accelerate or heaters come back from a setback. Those few minutes can set the maximum demand recorded on the bill and can determine the capacity of the switchboard. An assessment that looks only at average consumption misses them entirely. The short-interval record is examined for these events, and their timing is asked about, because a peak that happens once a month during a changeover is a different problem from one that happens every morning.

FIG 01In a plant, the electrical brief follows the process rather than the building's occupancy.

Characteristics that set the scope

The inputs below have to be known before a capacity is chosen. The same input can lead to different answers on two plants.

Plant inputs and what each one fixes

Load behaviour
Steady continuous demand, batch cycling or short high-magnitude start-up peaks, with the repeat frequency recorded.
Switchboard condition
Spare ways, protection age and physical room for new devices, verified before equipment is sized.
Power quality
Harmonics and voltage disturbance from drives, rectifiers or large motors, treated as a design constraint.
Motor duties
Starting current, duty cycle and the presence of soft starters or drives, which shape both peak and storage case.
Backup requirements
Circuits that must survive an outage identified separately from those that may be shed.
Access and isolation
Shift patterns and planned outages that decide when cable work can occur.
Roof programme
Any replacement or refurbishment that would make early panel fitting a wasted exercise.
Process tolerance
The extent to which production can be interrupted, shifted or curtailed without spoiling product.

Electrical realities

Harmonics, motors and the cost of a peak

Industrial electrical systems carry distortions that a commercial assessment would not expect. Variable speed drives, rectifiers and large motors can introduce harmonics into the waveform, and a poorly conditioned supply can affect protection devices, metering and other equipment on the same board. Where evidence of a power quality problem appears, it is recorded in the development notes and the appropriate specialist is engaged. Adding an inverter or a battery to an already disturbed system without understanding that context risks creating new faults.

Motor duties shape the case in a different way. A site with frequent starts may benefit from measures that reduce starting current, while a site with long steady runs may have little to gain from peak shaving. Duty cycle matters more than nameplate rating. Where soft starters or drives are already fitted, that is noted; where they are not, the possibility is recorded as an efficiency measure in its own right. Such a finding often belongs in a consulting review before capital equipment is considered at all.

Backup is another judgement that must be made explicitly. Some industrial loads cannot be interrupted without spoiling product or damaging equipment, while others can be dropped for the duration of an outage. A battery connected for peak reduction will not protect a critical circuit unless a transfer path and the right protection are provided. The circuits that genuinely require support, and the duration of that support, are established before a duty is specified. Where the requirement exceeds what storage can sensibly provide, that is stated plainly.

Working around a running plant

Installation on an operating site is a sequencing exercise. A production line cannot simply be switched off for a week of cable work, so the programme is built around isolation windows that may occur only during scheduled outages or between shifts. The order below is indicative and is drawn with the site's operating constraints rather than imposed on them.

Read the process

Establish the load pattern, start-up peaks, shift schedule and the circuits that cannot be interrupted.

Verify the board

Confirm spare capacity, protection condition and power quality before any new device is specified.

Align with the roof programme

Where a roof replacement is planned, sequence generation after the membrane work so panels are not removed twice.

Isolate in windows

Carry out switchboard and cable works during agreed outages or between shifts, keeping production as the overriding constraint.

Commission against the load

Test export behaviour, protection coordination and any storage duty under real operating conditions rather than on paper.

Diagnosing the load

From a nameplate to an operating pattern

A motor listed at a high output may spend most of its shift lightly loaded, while a smaller unit running continuously may dominate the account. The picture is built from interval data, from the sequence operators describe and, where necessary, from short-interval recording that captures events a monthly bill averages away. The purpose is to identify which loads set the peak and which merely contribute to the total, because the two require different responses. Where the record and the operator's account disagree, the disagreement is recorded and a site visit is scoped to settle that specific point.

Motor starting is the usual source of a peak that seems disproportionate to the plant's steady demand. Across-the-line starting can draw several times running current for a short period, and repeated starts across a shift can define the maximum demand recorded on the account. Starting method, start frequency and the presence of soft starters or drives are recorded. Where starting current is the problem, a control change may be more direct than adding capacity; where it is not, shaving the peak with storage may be justified. The diagnosis comes first because the two responses look similar on a bill and are quite different in practice.

Harmonics and power quality belong in the same diagnosis. Drives, rectifiers and large motors distort the waveform, and the effects appear in protection behaviour, metering accuracy and the performance of other equipment on the same board. Any evidence of disturbance is treated as a design constraint, and the relevant specialist is engaged where the record suggests a problem. The same caution applies to storage: a battery connected to a board with marginal power quality will expose weaknesses that were previously tolerable.

Shift patterns and installation windows

Shift work governs when physical work can happen more than it governs the electrical design. Cable runs, switchboard changes and inverter installation may be possible only between shifts or during a planned outage, and the window may be short. The programme is built around those windows rather than assuming a site can be isolated at convenience. Where a process cannot be interrupted at all, the work is scoped in stages completed during successive outages, with temporary arrangements agreed in advance. Production remains the overriding constraint.

Roof works create a second sequencing constraint. Where a membrane replacement or structural refurbishment is already planned, panels fitted beforehand would have to be removed and reinstated. The roof programme is recorded at the outset and generation placed after the roof work wherever possible. Where the two must overlap, the interface is written into the scope with responsibilities stated. On industrial buildings, roof access may also be constrained by overhead services, crane movement or the need to keep a bay operational throughout the works.

Load types

What each pattern asks for

The matrix pairs the load patterns most often found with the response that usually follows. A real site may exhibit several rows at once, and the order of work is decided only after the evidence is read.

Load typeWhat it looks likeResponse to investigate
Steady continuousFlat demand across shifts and weekends, with little variation between day and night.Generation sized to the base load; efficiency review of compressed air and process heat before capacity is fixed.
Batch cyclingRepeated high and low states as the plant moves through a production cycle.Interval review to find the duty; controls or storage only where a repeatable event can be addressed.
Start-up dominatedModest running demand punctuated by short, high motor-start peaks.Starting method and duty cycle assessment; soft starting or peak management before new capacity.
Heat-ledDemand that follows heating or cooling setpoints rather than production rate.Process heat and waste heat review; generation sized against the load left after recovery.
Critical circuitA load that cannot be interrupted without spoiling product or damaging plant.Defined backup duty with transfer and protection, rather than storage connected for peak reduction alone.
Before capacity

Spare ways, protection condition and power quality are verified. The board, not the roof, usually sets the ceiling on an older industrial site.

Before storage

A duty is stated and matched to the load profile. A flat daytime load with no demand charge and no evening demand gives a battery nothing useful to do.

Before handover

Export behaviour, protection coordination and any storage duty are tested under real operating conditions rather than accepted on paper.

Adjacent opportunities

Compressed air, waste heat and the case for storage

Two industrial loads sit close to the generation decision. Compressed air is often the largest avoidable load in a workshop, and leakage, poor sequencing and systems running across idle shifts can be quantified from the night-time record. Process heat may be produced as a by-product of plant operation, and where a use exists nearby it can reduce demand that would otherwise fall on the electrical supply. Neither is a generation technology, but both change the load that generation would serve, so both are recorded in the brief and any later array is sized against the site as it will be after those opportunities are understood.

Storage is justified in an industrial setting when it has a defined duty that the load profile can support. Peak shaving works where demand charges are driven by short, repeatable peaks that the battery can absorb. Evening or overnight supply works where shifts continue after generation falls away. Backup support works only where the necessary transfer and protection are provided. Where none of these conditions holds, storage is not recommended. A site with a flat daytime load, no demand charge and no evening demand has little for a battery to do.

Where the opposite is true, an integrated power arrangement may be the right scope, coordinating generation, storage and controllable plant as one system. Where the site's constraints are still unclear, development should come first. Either way the starting point is the process itself. Albeta Energy works from its single office at 12/43 Heathcote Road, Moorebank NSW 2170 and is not an electricity retailer.

Common questions

Questions about industrial facilities

How does the process load shape the brief?

Demand follows what the plant is doing: a continuous process draws a steady load for days, a batch operation cycles between high and near-idle states. The pattern is established from interval data and the operators' account of the sequence, then the two are tested against each other. Generation and storage are sized against that pattern, not against a commercial daytime profile or the nameplate ratings of the equipment.

Why does motor starting matter?

Across-the-line starting can draw several times running current for a short period, and repeated starts across a shift can set the maximum demand recorded on the account and determine switchboard capacity. Starting method, start frequency and the presence of soft starters or drives are recorded. Where starting current drives the peak, a control change may be more direct than adding capacity or storage.

How do shift patterns affect the work?

They set both the load profile and the installation windows. Cable runs, switchboard changes and inverter installation may be possible only between shifts or during a planned outage, and the window may be short. The programme is built around those windows, with temporary arrangements agreed in advance where a process cannot be interrupted.

What happens when isolation windows are short or rare?

The work is scoped in stages completed during successive outages rather than one continuous shutdown. Each stage is planned so the plant returns to service at the end of the window, and commissioning tests export behaviour, protection coordination and any storage duty under real operating conditions. Production remains the overriding constraint on the sequence.

How is generation staged around roof works?

The roof programme is recorded at the outset. Where a membrane replacement or structural refurbishment is planned, panels fitted beforehand would have to be removed and reinstated, so generation is placed after the roof work wherever possible. Where the two must overlap, the interface is written into the scope with responsibilities stated, and roof access constraints such as overhead services, crane movement or an operational bay are accounted for.

Process

Process load and the limits around it.

An industrial site is a production schedule before it is an electrical load.

Base load and process load behave differently. Base load runs through shifts and weekends; process load follows production, starts in blocks and produces the peaks that set demand charges. Separating the two from interval data is the first technical step, because a peak caused by a scheduled start is a sequencing question before it is a capacity question.

Isolation and access then constrain the installation. A line that cannot stop, a cold store that cannot warm, or a process that cannot lose supply for more than a defined window sets the programme. Cable routes, board work and testing are planned around that window, and the scope states what must be shut down and for how long.

Power quality is checked before inverters are added: harmonic distortion, voltage imbalance, existing filtering and the ride-through behaviour of process controls. An array that trips a drive or disturbs a control loop is a commissioning problem that was predictable at design.

Industrial facilities

Process, isolation and power quality.

The questions that decide work on a live production site.

How is process load separated from base load?

By reading interval data against the production record. A load that starts in blocks with shifts or batches is process load; a load that persists across shutdowns is base. The separation identifies which peaks can be managed and which are structural.

Can work proceed without stopping production?

Usually in stages and within defined windows. Board work, cable routes and testing are sequenced around planned outages, and any function that must remain live is identified before the programme is written.

How is power quality assessed before adding inverters?

Through a site measurement of harmonics, voltage balance and existing distortion, read alongside the process controls' tolerance. Where a drive or control loop is sensitive, filtering or a different connection point is specified before installation.

What governs rooftop access and maintenance?

The roof's structural certification, the fall-protection arrangement, the maintenance route and the plant beneath it. Access is designed with the maintenance task in mind, not added afterwards.

How is a demand peak attributed when several processes share a supply?

Through sub-metering on the circuits that could be responsible, read over the same intervals as the main meter. Attribution that rests on a shutdown test alone is weaker than one supported by continuous records.

Client comment

On working inside a shutdown window.

A comment on programming work around production.

“

Every task was written against the hours we could give them. Nothing was planned that assumed a longer stop than we had.

Production managerManufacturing plant, Western Sydney

Scope an industrial site

Send the process and supply facts.

Production pattern, shutdown windows and board condition set what is possible.

The production pattern: shifts, batch starts and seasonal peaks.

The shutdown window available, and how often it occurs.

Switchboard condition, and any known power quality issue.